Project name: Plant of prodiction Composite Pipes for crude oil
Ownership: Private property
Line: Building materials
Kind of Activity: Production GRP and GRE pipes
Amount of Credit: 6500000 USD (K)
Interest Rate: 12 %
Extra Conditions: INVESTMENT OFFER

Initiator of the project:
Company CHUY FRP Composite.

The essence of the project:
Organization of manufacture of GRP pipes for water and wastewater systems, as well as pipes for the oil industry in the two-component epoxy binder and pipes for the formation water and highly corrosive wastewater.

Existing industrial area:
Total production land area - 16000m2
Two industrial case (24x60x8 and 15x36x5)
Warehouse for raw materials, an area of 576m2
An office building, an area of 144m2
The production area is located in an industrial area, fully fenced and paved, has a branch line, fully secured by electricity, water and sewerage system.

Project cost: 5950 000,00 EURO.

The purpose of the investment proposal:
To attract an investment of 4,950,000 EURO for the purchase of equipment and working capital.

The products are:
1. GRP pipes for water supply and sanitation (GRP) with trumpet compounds produced by the winding of composite materials.
diametrical number (DN): 50-2000mm
Nominal pipe length (L): 6/9/12m
stiffness (SN) H/m2-5000/10000/ and more
Operating pressure (PN): 1/6/10/16/20/25/30/40bar (1 bar = 0,1 MPa)
2. GRP pipes for the transportation of crude oil (GRE) with a threaded connection on the epoxy binder.
diametrical number: 40/50/65/80/100/150/200mm
Nominal length: 9m
Operating pressure: 25-250bar (1 bar = 0,1 MPa)
Operating temperature (t ): 70/100/120 C
3. GRP two-pipe (GRP / UPVC) with a metal threaded connection for the transport of highly aggressive wastewater.
diametrical number: 100/150/200/250/300/350/400/450/500/600mm
Nominal length: 6/9/12m
Operating pressure: from 25bar to 100bar.
Operating temperature: up to 70C.
4. Products made of fiberglass pipes, such as elbow, tee, adapter, etc., well, CND (sewage pumping stations), tanks, flanges, ventilation ducts and more.

Production capacity:
1. Stationary equipment for water supply
Project production capacity - 180km per year
Planned production capacity - 150 km per year
2. Mobile equipment for water supply
Project production capacity - 50km per year
Planned production capacity - 30km per year
3. Equipment for oil pipes with epoxy binder
Project production capacity - about 500 km per year
Planned production capacity - 300 km per year
4. Equipment for two-component tube
Project production capacity - 150 km per year
Planned production capacity - 100 km per year

Comparative value of finished goods:
Fiberglass Pipe DN1000mm/PN-6 bar/SN-10000H/m² / L12m (GRP)
- Market price of LPG over the condition EXW - 300 EURO per 1m.
- Planned sales price on the condition EXW - 191 EURO per 1m.
Fiberglass Pipe DN500mm/PN-6 bar/SN-10000H.m ² / L6m
- Market price of LPG over the condition EXW - 90 EURO per 1p.m.
- Planned sales price on the condition EXW - 60 EURO per 1p.m.
Fiberglass Pipe DN100mm/PN-70bar/L9m/t90 C (GRE-oil)
- Market price of LPG over the condition EXW - 45 EURO per 1p.m.
- Planned sales price on the condition EXW - 26.4 EURO for 1p.m.
Fiberglass Pipe DN200mm/PN-25bar/L9m/t70 C (GRP / UPVC)
- Market price of LPG over the condition EXW - 70 EURO per 1p.m.
- Planned sales price on the condition EXW - 46.2 EURO for 1p.m.

Financial:
Payback period - 4 years
The estimated break-even point - 187,3 km per year, namely,
DN1000mm (GRP) - 20211m.
DN500mm (GRP) - 16222m
DN100mm (GRE) - 110071m
DN200mm (GRP / UPVC) - 40796m
With a total of 31,5% of the planned production capacity of equipment.
IRR (rate of return) - 42,3%
Project NPV - 8,3 million EURO.
Payback: 60 months